Les Ambassadeurs Club – Data Centre Project
The Les Ambassadeurs site itself, Hamilton Place, is protected by English Heritage, which presented us with several challenges. The proposed data centre area was incredibly small, with space for only four server racks managing up to 15kW each. The client also required chilled water and DX cooling for redundancy.
The construction took place over the course of 12 weeks. During this time, raised flooring, cable containment, chilled water and DX cooling, server racks, N+N power distribution and 93PM 50kW UPS systems were installed. Carter Sullivan also worked closely with the client to allow structured cabling and fire suppression to be installed at key points throughout the project.
The project was meticulously planned with English Heritage regulations and space limitations in mind. The programme for deliveries and installation was carefully controlled, along with the design of raised flooring to allow for tile removal and access.
The Les Ambassadeurs data centre project was completed on time and to budget. Both our client Eaton and their customer, the casino, were tremendously happy with the results. Though challenging, it proved to be an enjoyable and exciting project and one that we will remember with fondness.
The Les Ambassadeurs site itself, Hamilton Place, is protected by English Heritage, which presented us with several challenges. The proposed data centre area was incredibly small, with space for only four server racks managing up to 15kW each. The client also required chilled water and DX cooling for redundancy.
The construction took place over the course of 12 weeks. During this time, raised flooring, cable containment, chilled water and DX cooling, server racks, N+N power distribution and 93PM 50kW UPS systems were installed. Carter Sullivan also worked closely with the client to allow structured cabling and fire suppression to be installed at key points throughout the project.
The project was meticulously planned with English Heritage regulations and space limitations in mind. The programme for deliveries and installation was carefully controlled, along with the design of raised flooring to allow for tile removal and access.
The Les Ambassadeurs data centre project was completed on time and to budget. Both our client Eaton and their customer, the casino, were tremendously happy with the results. Though challenging, it proved to be an enjoyable and exciting project and one that we will remember with fondness.